BIO-DIGESTER TOILET CONSTRUCTION AND INSTALLATION MANUAL
Activities:
Excavation is done at this point. The excavation should be done as per the gradient
set for the digester and the piping.
1. Put on gloves and carefully dig pit within the set-out range using the pickaxe
2. Ensure that dug out soil is kept at a considerable distance from the pit to prevent
them from falling back into the pit
3. Excavate to the required depth
4. Do not increase or decrease the dimensions of the ditch
5. Avoid standing on the edges of the ditches as they might collapse. Protect the
areas already excavated to prevent accidents.